Sign In | Join Free | My himfr.com
Home > Wastewater Treatment Plant Equipment >

Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment

ZHANGJIAGANG CITY PEONY MACHINERY CO.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment from wholesalers
     
    Buy cheap Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment from wholesalers
    • Buy cheap Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment from wholesalers
    • Buy cheap Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment from wholesalers
    • Buy cheap Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment from wholesalers

    Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment

    Ask Lasest Price
    Brand Name : Peony
    Delivery Time : 60 days
    Payment Terms : TT, L/C
    Supply Ability : 30 sets/month
    Certification : ISO9001&ISO14001,CE
    Model Number : PDC
    • Product Details
    • Company Profile

    Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment

    PLC Control System

    It is well-known that PLC is widely used in industrial auto control system, because of its stable operation, resistance to disturbing, safety operation, easy configuration and software programming. SCI developed PLC control System for sludge dewatering complete equipment to fit for the complicated treatment and high requirements from sludge dewatering. It can automatically adjust the differential speed and feed flow rate. This control system is highly automated. It can operate the factory without human. It can display many specifications and has more than 30 kinds of trouble monitoring, alarming and protecting functions for equipment operation. This will make the whole working system more safe and reliable.

    PLC Controller + PLC Control System


    The above-mentioned PLC control system can communicate with the central control room PC through network by means of communication interface to on-site PC or network communication system demanded by customer.

    Able to control automatically as above-mentioned PLC control system;

    Able to monitor dynamically the sludge dewatering on the PC screen, the working conditions of all the equipments and other related specifications are displayed as figures;

    Able to draw the history trend curve of specifications;

    Able to display and print report form for a day, a month or a year;


    The on-site PC and central control upstream computer can monitor the working status of several sets of sludge dewatering equipments. It can also remote control the starting or stopping of each sludge dewatering set.

    To avoid unauthorized person from entering the system, it has setting functions in three levels.


    Specification


    ModelCapacity(m3/h)Drum diameter(mm)
    PDC-10-W0.5~5250
    PDC-12-W1~10350
    PDC-14-W1~20355
    PDC-16-W
    2~25400
    PDC-18-4.4-W
    3~25450
    PDC-20-4-W
    5~45500
    PDC-21-W
    15~65530
    PDC-23-W
    20~80580
    PDC-26-W
    20~110650

    Application


    Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment


    Processing equipment


    Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment

    Quality Sludge Dewatering Complete Equipment Wastewater Treatment Plant Equipment for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: ZHANGJIAGANG CITY PEONY MACHINERY CO.,LTD
    *Subject:
    *Message:
    Characters Remaining: (0/3000)